TTE296

ANÁLISIS DE INESTABILIDADES CON CONTROL ESTRUCTUAL PARA FASES 11 Y 12, DIVISIÓN GABRIELA MISTRAL, CODELCO, CHILE.

change for the phase, a different treatment in blasting and operational methods. In this way,

avoid loss of pit design.

17

Made with FlippingBook flipbook maker